{"id":122,"date":"2026-10-08T10:05:40","date_gmt":"2026-10-08T08:05:40","guid":{"rendered":"https:\/\/www.rig-up.fr\/references\/rigging-exemple-a-choisir\/"},"modified":"2026-11-18T12:59:15","modified_gmt":"2026-11-18T11:59:15","slug":"rigging-exemple-a-choisir","status":"publish","type":"reference","link":"https:\/\/www.rig-up.fr\/en\/references\/rigging-exemple-a-choisir\/","title":{"rendered":"Arcade Fire"},"content":{"rendered":"<h3 class=\"wp-block-heading\"><strong>ARCADE FIRE \u00d7 RIG\u2019UP: A CENTRAL STAGE AT THE Z\u00c9NITH DE NANTES<\/strong><\/h3>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph translation-block\">For Arcade Fire\u2019s concert at the Z\u00e9nith de Nantes, Rig\u2019Up\u00ae handled the entire rigging for the production: adapting the rig plans to the venue, and rigging a central stage and giant 360\u00b0 screens. In total, 86 tonnes were flown, an extraordinary configuration in one of the largest arenas in western France.<\/p>\n<\/blockquote>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Client:<\/strong>&nbsp;Arcade Fire<\/li>\n\n\n\n<li><strong>Location:<\/strong>&nbsp;Z\u00e9nith de Nantes M\u00e9tropole<\/li>\n\n\n\n<li><strong>Year:<\/strong>&nbsp;2017<\/li>\n\n\n\n<li><strong>Services:<\/strong>&nbsp;Engineering, Rigging<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>The Project<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Install a central stage surrounded by the audience, with giant screens visible from every angle, in an arena designed for a traditional end-stage setup. A technical challenge that required completely rethinking the production\u2019s rigging.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>OUR WORK<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>- <strong>Engineering:<\/strong>&nbsp;drawing and adapting the production\u2019s rig plans to the Z\u00e9nith\u2019s configuration.<\/li>\n\n\n\n<li>- <strong>Rigging:<\/strong>&nbsp;rigging of the central stage and giant 360\u00b0 screens.<\/li>\n\n\n\n<li>- <strong>Build and dismantling:<\/strong>&nbsp;27 Rig\u2019Up riggers on site.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>KEY FIGURES<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>86 t<\/strong>&nbsp;rigged<\/li>\n\n\n\n<li><strong>27<\/strong>&nbsp;riggers on site<\/li>\n\n\n\n<li><strong>360\u00b0<\/strong>&nbsp;giant screens<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>ARCADE FIRE \u00d7 RIG\u2019UP : UNE SC\u00c8NE CENTRALE AU Z\u00c9NITH DE NANTES Pour le concert d\u2019Arcade Fire au Z\u00e9nith de Nantes, Rig\u2019Up\u00ae a accompagn\u00e9 la production sur l\u2019ensemble du rigging : r\u00e9adaptation des plans de rig \u00e0 la salle, accroche d\u2019une sc\u00e8ne centrale et d\u2019\u00e9crans g\u00e9ants \u00e0 360\u00b0. Au total,&nbsp;86 tonnes ont \u00e9t\u00e9 accroch\u00e9es, une [&hellip;]<\/p>\n","protected":false},"featured_media":472,"template":"","type_projet":[2],"class_list":["post-122","reference","type-reference","status-publish","has-post-thumbnail","hentry","type_projet-rigging"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.rig-up.fr\/en\/wp-json\/wp\/v2\/reference\/122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rig-up.fr\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.rig-up.fr\/en\/wp-json\/wp\/v2\/types\/reference"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rig-up.fr\/en\/wp-json\/wp\/v2\/media\/472"}],"wp:attachment":[{"href":"https:\/\/www.rig-up.fr\/en\/wp-json\/wp\/v2\/media?parent=122"}],"wp:term":[{"taxonomy":"type_projet","embeddable":true,"href":"https:\/\/www.rig-up.fr\/en\/wp-json\/wp\/v2\/type_projet?post=122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}